Most prefab and architectural projects fail on communication, not capability. FABMOUNT works to a transparent six-step program so you know what happens, when, and why.

How we work

From inquiry to installed in six steps.

A predictable, transparent path from first email to operational pod or stamped drawings.

  1. 01

    Inquiry

    Share your brief, site and intent. We respond within 24 hours.

  2. 02

    Design

    Architectural drawings or pod configuration delivered in 72 hours.

  3. 03

    Approval

    You sign off scope, finishes and price. Secure PayPal checkout.

  4. 04

    Production

    Pods built in our facility · drawings finalised in studio.

  5. 05

    Shipping

    Two-module export packaging. Worldwide freight included.

  6. 06

    Installation

    Plug-and-play assembly on site, days not months.

For pods

Lead time

Production typically completes in 6–10 weeks from approval, plus destination-specific shipping. We commit to a calendar at sign-off and report weekly.

For architectural services

Delivery

Concept set in 72 hours. Approval-ready drawings within 7–14 days depending on scope. All revisions handled in studio at $1/sqft.